Petition of the GERC (Conduct of Business) Regulations for construction of the evacuation infrastructure and quashing of the letter – EQ
Summary:
—
## **Daily Order – Petition No. 2513 of 2025**
**Issued by:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar
**Date of Order:** 04 August 2025
—
### **Case Title**
**Petitioner / Applicant:** Tisza Solar Pvt. Ltd., Gurgaon, Haryana
**Respondent:** Gujarat Energy Transmission Corporation Ltd. (GETCO), Vadodara
**Interlocutory Application:**
* **IA No. 57 of 2025** – Urgent listing & interim relief application under Sec. 94(2), EA 2003 and Regulations 61 & 80 of GERC Conduct of Business Regulations.
—
### **Subject Matter**
Petition filed under Sections **86(1)(c), (e), (f) of the Electricity Act, 2003** seeking:
* **Extension of time** for construction of evacuation infrastructure.
* **Quashing of GETCO’s letter dated 13.06.2025**, which raised compliance/commissioning concerns.
—
### **Hearing Proceedings (31.07.2025)**
* **Respondent (GETCO)** through Adv. Aneesh Bajaj submitted that their **Reply is yet to be filed** and requested **4 weeks’ extension**.
* **Petitioner’s Counsel (Adv. Aditya Singh)** did **not object** to adjournment request.
—
### **Commission’s Observations & Directions**
1. Request for time to file reply considered.
2. **Three weeks granted** to Respondent to file Reply (copy to Petitioner).
3. Petitioner may file **Rejoinder within 1 week thereafter** (copy to Respondent).
4. Both parties directed to **complete pleadings before next hearing**.
5. **IA No. 57 of 2025** stands disposed as matter has already been listed.
—
**Coram:**
* Mehul M. Gandhi, Member
* S.R. Pandey, Member
**Place:** Gandhinagar
**Date:** 04 August 2025
—
For more information please see below link:
Related posts:
- Petition of the GERC (Conduct of Business) Regulations for commissioning the entire evacuation infrastructure due to occurrence of uncontrollable events – EQ
- Petition of the GERC (Conduct of Business) Regulations of the evacuation infrastructure for commissioning of the entire capacity of 25 MW of Wind- Solar Hybrid Power – EQ
- In the matter of the GERC(Conduct of Business) Regulations of the Tariff Order and Civil Procedure – EQ
- Petition of the GERC (Conduct of Business) Regulations 2004 for extension of time period for commissioning the entire evacuation line – EQ