
Petition of the GERC (Conduct of Business) Regulations of the evacuation infrastructure for commissioning of the entire capacity of 25 MW of Wind- Solar Hybrid Power – EQ
0
0
Petition of the GERC (Conduct of Business) Regulations of the evacuation infrastructure for commissioning of the entire capacity of 25 MW of Wind- Solar Hybrid Power
For more information please see below link:
Related posts:
- Petition of the GERC (Conduct of Business) Regulations for commissioning the entire evacuation infrastructure due to occurrence of uncontrollable events – EQ
- Petition of the GERC (Conduct of Business) Regulations 2004 for extension of time period for commissioning the entire evacuation line – EQ
- Petition of ‘Tariff Framework for Procurement of Power by Distribution Licensees and Others from Wind-Solar Hybrid Projects with the Scheduled Date of Commissioning its 70 MW Hybrid Power Plant located at Village Dwarka, Gujarat – EQ
- Petition of the Electricity Act of the GERC (Conduct of Business) Regulations in commissioning of generation capacity – EQ
tags:
25 MW Commissioning Conduct of Business evacuation infrastructure GERC HYBRID POWER REGULATIONS the entire capacity Wind-solar