CIL issue Tender for Setting up of 875 MW Solar PV Plant on turnkey basis along with 2 years comprehensive O&M at Pugal, District- Bikaner of Rajasthan – EQ

CIL issue Tender for Setting up of 875 MW Solar PV Plant on turnkey basis along with 2 years comprehensive O&M at Pugal, District- Bikaner of Rajasthan – EQ

0
0

Summary:

### 📄 **Coal India Limited (CIL) – Tender Summary: 875 MW Solar PV Project in Rajasthan**

**Tender ID:** 2025\_CILHQ\_340005
**Date Issued:** 21 July 2025
**Issued By:** Coal India Limited (CIL)
**Project Location:** Pugal, District Bikaner, Rajasthan
**Joint Venture:** CIL & RVUNL (Rajasthan Rajya Vidyut Utpadan Nigam Limited)
**Implementing Agency:** CIL Rajasthan Akshay Urja Limited
**Project Capacity:** 875 MW (AC) ground-mounted solar PV
**Mode of Tendering:** e-Tendering (Single-stage, Two-part system)

### 🔍 **Project Scope:**

The tender is for setting up a **875 MW (AC) solar photovoltaic plant** on a turnkey basis including:

* **Design, engineering, procurement, supply, installation & commissioning**
* **Supply of 1182 MWp PV modules** with DC overloading
* Associated **electrical systems**, inverters, switchgear, metering, transformers
* **Civil infrastructure**: grading, stormwater drainage, internal roads
* **Fire protection system**, cleaning infrastructure
* **Mandatory spares, special tools, and statutory compliance**
* **2 years of comprehensive O\&M** post-commissioning

### 📊 **Performance Requirements:**

* **Minimum CUF (Capacity Utilization Factor):** 25%
* **Minimum Net Electrical Energy Generation Guarantee (NEEGG):**
1,916,250,000 units in Year 1
* **NEEGG degradation allowed:** Max 0.5% annually

### 📅 **Key Dates:**

* Tender submission, pre-bid meeting, and technical bid opening dates are as per portal schedule.
* **Commissioning Deadline:** 24 months from work commencement
* **O\&M Period:** 2 years from Commercial Operation Date (COD)
* **SCOD Auto-extension:** Up to 6 months or until transmission system readiness

### 💰 **Financial Requirements:**

* **Earnest Money Deposit (EMD):** ₹50 Lakhs (online payment only)
* **Performance Security:** Applicable as per NIT
* **Average Turnover (last 3 years):** Minimum ₹1,263 Crores
* **Net Worth (as of 31 March 2025):** Minimum ₹421 Crores
* **GST Registration and PAN:** Mandatory

### ✅ **Eligibility Criteria:**

#### **Work Experience:**

Bidder must fulfill either:

* **Route I (EPC):**
Cumulative 175 MW (AC) solar projects with ≥44 MW each on turnkey basis, commissioned and operational for at least 6 months.

* **Route II (Developer):**
Cumulative 175 MW (AC) developed, ≥44 MW each, and in operation for at least 6 months.

> Work completion by a non-government entity requires ITR/Form-16.

#### **Joint Ventures (JV):**

* Max 3 members allowed.
* Lead partner: min 50% share.
* Others: min 20% each.
* JV must submit a legally valid agreement with joint and several liability.

### 🧾 **Evaluation Criteria:**

* **L1 Bidder Selection:** Based on **Evaluated Bid Value (EBV)** – includes supply, services, O\&M, taxes, etc.
* Price bid in **Excel BOQ format** – to be uploaded on portal.
* **Only Class-I and Class-II local suppliers** (as per Make in India policy) are eligible.

* Purchase preference applicable to **Class-I local suppliers**.

### 🌐 **e-Procurement Details:**

* Website: [https://coalindiatenders.nic.in](https://coalindiatenders.nic.in)
* Digital Signature Certificate (DSC) mandatory
* Bids only accepted **online**; no offline submissions allowed

### 📞 **Tender Contacts (CIL Solar Dept):**

* **Anil Kumar (GM MM)** – [hodsolar.cil@coalindia.in](mailto:hodsolar.cil@coalindia.in) – 📞 033-23244342
* **Jitendra Kr. Singh (Sr. Manager E\&M)** – [singh.jitendra@coalindia.in](mailto:singh.jitendra@coalindia.in)
* **Rajnesh Meena (Dy. Manager E\&M)** – [rajnish.meena@coalindia.in](mailto:rajnish.meena@coalindia.in)

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network