e-RA: – The Leading Solar Magazine In India https://www.eqmagpro.com Tue, 26 Aug 2025 05:47:45 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.2 https://www.eqmagpro.com/wp-content/uploads/2019/05/cropped-eq-logo-32x32.png e-RA: – The Leading Solar Magazine In India https://www.eqmagpro.com 32 32 Snapshot after e-RA for Project-VI: Paradeep Phosphate Limited, Zuarinagar (25,000 MT) – EQ https://www.eqmagpro.com/snapshot-after-e-ra-for-project-vi-paradeep-phosphate-limited-zuarinagar-25000-mt-eq/ Tue, 26 Aug 2025 05:47:45 +0000 https://www.eqmagpro.com/?p=350473 Summary:

## **Snapshot Summary – Green Ammonia Bidding (SIGHT Scheme)**

**Document Type:** Post e-Reverse Auction (e-RA) Snapshot
**Date:** 25.08.2025
**Issued under:** Solar Energy Corporation of India Ltd. (SECI)
**RfS Reference:** SECI/C\&P/MI/00/0002/2024-25
**RfS Date:** 07.06.2024
**Scheme:** SIGHT Scheme – Mode-2A – Tranche-I

### **1. Project Details**

* **Project No.:** VI
* **Entity:** Paradeep Phosphate Limited (PPL)
* **Location:** Zuarinagar
* **Capacity:** 25,000 MT (Green Ammonia production & supply)

### **2. Purpose of Document**

* Provides snapshot after **e-RA (e-Reverse Auction)** held on **25.08.2025**.
* Confirms conclusion of competitive bidding for **production and supply of Green Ammonia** under SIGHT Scheme.

### **3. Key Highlights**

* e-RA successfully conducted for **Project VI**.
* Project is part of India’s **first large-scale procurement round for Green Ammonia**.
* Capacity allocated = **25,000 MT** at PPL’s Zuarinagar unit.
* Commercial details (tariff discovered, bidders ranking, etc.) are not shown in the snapshot provided (likely in detailed SECI bid evaluation report).

### **4. Outcome**

* **Status:** e-RA completed successfully.
* **Next Steps:** Adoption of tariff and issuance of **Letter of Award (LoA)** to successful bidder, followed by PPA/SPA execution under SIGHT Scheme framework.

For more information please see below link:

]]>
Snapshot after e-RA for Project-II: IFFCO, Paradeep (1,00,000 MT) – EQ https://www.eqmagpro.com/snapshot-after-e-ra-for-project-ii-iffco-paradeep-100000-mt-eq/ Sat, 23 Aug 2025 05:52:41 +0000 https://www.eqmagpro.com/?p=350358 Summary:

## **SECI Green Ammonia Project-II (IFFCO, Paradeep)**

### 📌 Project Overview

* **Project Name:** Project-II – IFFCO Paradeep
* **Capacity:** **1,00,000 Metric Tonnes (MT)** of Green Ammonia production & supply
* **Location:** Paradeep, Odisha
* **Scheme:** *SIGHT Scheme – Mode-2A, Tranche-I*
* **RfS Reference:** SECI/C\&P/MI/00/0002/2024-25 dated 07.06.2024
* **Auction Date:** 22.08.2025

This project is part of India’s national strategy to accelerate **green hydrogen and green ammonia adoption** by providing long-term supply contracts under SECI’s flagship **SIGHT programme**.

### ⚡ Bidding & Auction Process

* Conducted via **Electronic Reverse Auction (e-RA)** on 22nd August 2025.
* Purpose: To discover the most competitive price for production and long-term supply of green ammonia.
* The **e-RA model** encourages bidders to progressively lower tariffs during the auction window, leading to transparent price discovery.

### 🏭 Buyer & Offtake Commitment

* **Buyer:** *Indian Farmers Fertiliser Cooperative Limited (IFFCO)* – one of India’s largest fertilizer producers.
* IFFCO’s Paradeep unit (in Odisha) is a major ammonia and urea production facility, consuming large quantities of feedstock ammonia.
* Under this project, IFFCO secures a **domestic supply of green ammonia**, reducing dependence on imported ammonia (currently fossil-fuel based).

### 🌱 Strategic Importance

* This is among the **largest single-location green ammonia contracts** under the SIGHT scheme.
* Supports India’s target of **5 MMT of green hydrogen/derivatives by 2030**.
* Contributes to **fertilizer sector decarbonization**, one of the government’s priority use-cases for green hydrogen/ammonia.

### 📊 Expected Outcomes

1. **Green Ammonia Supply Security:** Ensures 1 lakh MT of annual supply to IFFCO Paradeep.
2. **Import Substitution:** Reduces foreign exchange outgo on imported grey ammonia.
3. **Emission Reduction:** Each tonne of green ammonia avoids significant CO₂ emissions compared to fossil-derived ammonia.
4. **Price Discovery:** The e-RA outcome sets benchmarks for future bidding rounds under SIGHT Mode-2A.

### 🔑 Implications

* **For IFFCO:** Long-term assured green ammonia at competitive discovered price.
* **For Developers:** A landmark opportunity to scale green ammonia production projects in India.
* **For Policy:** Demonstrates viability of government-backed reverse auction schemes in hard-to-abate industrial sectors like fertilizers.

👉 In short: The **IFFCO Paradeep Project-II** under SECI’s SIGHT scheme marks a milestone — securing **1 lakh MT/year of green ammonia** through transparent competitive bidding, directly supporting India’s fertilizer industry and decarbonization goals.

For more information please see below link:

]]>
Snapshot after e-RA for Project-IX: Coromandel International Limited (CIL), Vishakhapatnam (50,000 MT) – EQ https://www.eqmagpro.com/snapshot-after-e-ra-for-project-ix-coromandel-international-limited-cil-vishakhapatnam-50000-mt-eq/ Tue, 19 Aug 2025 06:39:09 +0000 https://www.eqmagpro.com/?p=350128 Summary:

## **Snapshot after e-RA – Project-IX (Coromandel International Ltd., Visakhapatnam)**

**Issued by:** Solar Energy Corporation of India Ltd. (SECI)
**Scheme:** SIGHT Scheme – Mode 2A (Tranche-I)
**RfS No.:** SECI/C\&P/MI/00/0002/2024-25
**Date of RfS:** 07 June 2024
**Date of e-RA:** 18 August 2025

### **Project Details**

* **Project Proponent:** Coromandel International Limited (CIL)
* **Location:** Visakhapatnam, Andhra Pradesh
* **Product:** Green Ammonia
* **Capacity:** 50,000 Metric Tonnes (MT)
* **Scheme Coverage:** Production and Supply of Green Ammonia in India under the National Green Hydrogen Mission (NGHM).

### **Process**

* The snapshot represents the outcome of the **electronic Reverse Auction (e-RA)** conducted on **18.08.2025**.
* Conducted as part of **RfS for Green Ammonia Production & Supply** under the SIGHT Scheme, Mode 2A, Tranche-I.

### **Outcome**

* Coromandel International Limited (CIL) successfully participated for allocation of **50,000 MT Green Ammonia capacity**.
* Results to be used by SECI in finalizing **Letter of Award (LoA)** and subsequent agreements.

For more information please see below link:

]]>
Snapshot after e-RA for Project-XIII: Madhya Bharat Agro Products Limited-III, Dhule (70,000 MT) – EQ https://www.eqmagpro.com/snapshot-after-e-ra-for-project-xiii-madhya-bharat-agro-products-limited-iii-dhule-70000-mt-eq/ Mon, 11 Aug 2025 06:06:39 +0000 https://www.eqmagpro.com/?p=349731 Summary:

## **e-RA Snapshot for Project-XIII**

**Date:** 08 August 2025
**Project:** Madhya Bharat Agro Products Limited-III, Dhule (Capacity: 70,000 MT)
**Context:**

* This snapshot records the results of an **electronic Reverse Auction (e-RA)** conducted for **Project-XIII** under the **RfS for Production and Supply of Green Ammonia in India**.
* Scheme: **SIGHT Scheme (Mode-2A-Tranche-I)**
* RfS Reference: **SECI/C\&P/MI/00/0002/2024-25** dated 07 June 2024.

### **Key Details**

* **Entity:** Madhya Bharat Agro Products Limited (3rd project) located in **Dhule**.
* **Capacity:** 70,000 Metric Tonnes (MT) of Green Ammonia.
* **Purpose:** Selection of producer under SECI’s initiative to boost domestic green ammonia production in alignment with India’s renewable energy and green hydrogen mission.
* **Process:** e-RA was conducted on **08.08.2025** to finalize competitive tariffs and allocations.

For more information please see below link:

]]>
Snapshot after e-RA for Project-5: Paradeep Phosphate Limited, Paradeep (75,000 MT) – EQ https://www.eqmagpro.com/snapshot-after-e-ra-for-project-5-paradeep-phosphate-limited-paradeep-75000-mt-eq/ Wed, 30 Jul 2025 06:03:33 +0000 https://www.eqmagpro.com/?p=349204 Snapshot after e-RA for Project-5: Paradeep Phosphate Limited, Paradeep (75,000 MT)

For more information please see below link:

]]>
e-RA for assured Peak supply of 8000 MWh (2000 MW x 4 Hrs.) from ISTS-Connected RE Projects (SECI-FDRE-VI) – EQ https://www.eqmagpro.com/e-ra-for-assured-peak-supply-of-8000-mwh-2000-mw-x-4-hrs-from-ists-connected-re-projects-seci-fdre-vi-eq/ Fri, 03 Jan 2025 05:25:36 +0000 https://www.eqmagpro.com/?p=338621 e-RA for assured Peak supply of 8000 MWh (2000 MW x 4 Hrs.) from ISTS-Connected RE Projects (SECI-FDRE-VI)

For more information please see below link:

]]>
Breaking News : e-RA for 1000 MW ISTS-Connected Solar PV Projects in India (SECI-ISTS-XVIII) – EQ https://www.eqmagpro.com/breaking-news-e-ra-for-1000-mw-ists-connected-solar-pv-projects-in-india-seci-ists-xviii-eq/ Tue, 24 Dec 2024 11:41:49 +0000 https://www.eqmagpro.com/?p=338264 Breaking News : e-RA for 1000 MW ISTS-Connected Solar PV Projects in India (SECI-ISTS-XVIII)

For more information please see below link:

]]>
Breaking News : e-RA for 600 MW ISTS-Connected Wind-Solar Hybrid Power Projects (SECI-Tranche-IX) – EQ https://www.eqmagpro.com/breaking-news-e-ra-for-600-mw-ists-connected-wind-solar-hybrid-power-projects-seci-tranche-ix-eq/ Thu, 03 Oct 2024 06:17:34 +0000 https://www.eqmagpro.com/?p=335225 Breaking News : e-RA for 600 MW ISTS-Connected Wind-Solar Hybrid Power Projects (SECI-Tranche-IX)

For more information please see below link:

]]>
e-RA for 1000 MW/2000 MWh Standalone BESS Projects in India(ESS-2) – Prices being quoated in INR/MW/month – EQ https://www.eqmagpro.com/e-ra-for-1000-mw-2000-mwh-standalone-bess-projects-in-indiaess-2-prices-being-quoated-in-inr-mw-month-eq/ Sat, 14 Sep 2024 07:35:17 +0000 https://www.eqmagpro.com/?p=334645 e-RA for 1000 MW/2000 MWh Standalone BESS Projects in India(ESS-2) – Prices being quoated in INR/MW/month

For more information please see below link:

]]>
e-RA for 500 MW ISTS-Connected Solar PV Power Projects (SECI-ISTS-XVI) – EQ https://www.eqmagpro.com/e-ra-for-500-mw-ists-connected-solar-pv-power-projects-seci-ists-xvi-eq/ Sat, 17 Aug 2024 05:20:00 +0000 https://www.eqmagpro.com/?p=333646 e-RA for 500 MW ISTS-Connected Solar PV Power Projects (SECI-ISTS-XVI)

For more information please see below link:

]]>
Breaking News : e-RA for 1500 MW Firm and Dispatchable Power from RE Power Projects in India (SECI-FDRE-II) – EQ https://www.eqmagpro.com/breaking-news-e-ra-for-1500-mw-firm-and-dispatchable-power-from-re-power-projects-in-india-seci-fdre-ii-eq/ Tue, 12 Mar 2024 11:10:37 +0000 https://www.eqmagpro.com/?p=327226 Breaking News : e-RA for 1500 MW Firm and Dispatchable Power from RE Power Projects in India (SECI-FDRE-II)

For more information see bellow link

 

 

]]>
Breaking News : e-RA for 1012 MW Hybrid Power Projects (SECI-Tranche-VII) – EQ https://www.eqmagpro.com/breaking-news-e-ra-for-1012-mw-hybrid-power-projects-seci-tranche-vii-eq/ Tue, 09 Jan 2024 09:26:49 +0000 https://www.eqmagpro.com/?p=324078 Breaking News : e-RA for 1012 MW Hybrid Power Projects (SECI-Tranche-VII)

For more information please see below link:

]]>
Breaking News: e-RA for 2000 MW ISTS-connected Solar PV Projects (ISTS-XI) – EQ Mag https://www.eqmagpro.com/breaking-news-e-ra-for-2000-mw-ists-connected-solar-pv-projects-ists-xi-eq-mag/ Fri, 21 Jul 2023 11:23:36 +0000 https://www.eqmagpro.com/?p=317180 Breaking News: e-RA for 2000 MW ISTS-connected Solar PV Projects (ISTS-XI)

]]>
Breaking News : e- RA for 1200 MW Hybrid Power Projects (Tranche- VI) – EQ Mag https://www.eqmagpro.com/breaking-news-e-ra-for-1200-mw-hybrid-power-projects-tranche-vi-eq-mag/ Wed, 12 Apr 2023 11:05:06 +0000 https://www.eqmagpro.com/?p=309697 Breaking News : e- RA for 1200 MW Hybrid Power Projects (Tranche- VI)

]]>
Results of e-RA: RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XII) – EQ Mag Pro https://www.eqmagpro.com/results-of-e-ra-rfs-for-1200-mw-ists-connected-wind-power-projects-tranche-xii-eq-mag-pro/ Fri, 15 Jul 2022 05:08:04 +0000 https://www.eqmagpro.com/?p=287263

Results of e-RA: RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XII).

For more information please see below link:

]]>
Results of e-RA: RfS for 1785 MW Grid-connected Solar PV Projects in Rajasthan (Tranche-IV) – EQ Mag Pro https://www.eqmagpro.com/results-of-e-ra-rfs-for-1785-mw-grid-connected-solar-pv-projects-in-rajasthan-tranche-iv-eq-mag-pro/ Wed, 16 Feb 2022 11:06:47 +0000 https://www.eqmagpro.com/?p=270158

Results of e-RA: RfS for 1785 MW Grid-connected Solar PV Projects in Rajasthan (Tranche-IV).

For more information please see below link:

]]>
Breaking News: Tender results of e- RA for 600 MW Solar PV Projects near Gadag Substation (ISTS-X) – EQ Mag Pro https://www.eqmagpro.com/breaking-news-tender-results-of-e-ra-for-600-mw-solar-pv-projects-near-gadag-substation-ists-x-eq-mag-pro/ Fri, 04 Feb 2022 11:59:16 +0000 https://www.eqmagpro.com/?p=268616

Breaking News: Tender results of e- RA for 600 MW Solar PV Projects near Gadag Substation (ISTS-X).

]]>
Breaking News : Tender Results of e-RA for setting up of 600 MW Solar PV Projects near Koppla Substation (ISTS-X) – EQ Mag Pro https://www.eqmagpro.com/breaking-news-tender-results-of-e-ra-for-setting-up-of-600-mw-solar-pv-projects-near-koppla-substation-ists-x-eq-mag-pro/ Wed, 02 Feb 2022 12:36:38 +0000 https://www.eqmagpro.com/?p=268257

Breaking News : Tender Results of e-RA for setting up of 600 MW Solar PV Projects near Koppla Substation (ISTS-X).

]]>
Results of e-RA: RfS for 1200 MW ISTS-connected Wind-Solar Hybrid Power Projects in India (Tranche-IV) – EQ Mag Pro https://www.eqmagpro.com/results-of-e-ra-rfs-for-1200-mw-ists-connected-wind-solar-hybrid-power-projects-in-india-tranche-iv-eq-mag-pro/ Wed, 02 Feb 2022 10:32:07 +0000 https://www.eqmagpro.com/?p=268247