Site visit and Pre Bid Meeting notification: Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, Madhya Pradesh – EQ
Site visit and Pre Bid Meeting notification: Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, Madhya Pradesh.
Owner: Solar Energy Corporation of India Limited (SECI), New Delhi, India
Tender No: SECI/C&P/OP/11/017/2024-25
ETS ID: SECI-2025-TN000009
CPPP ID: 2025_SECI_796716_1
Details regarding Site visit & Pre-Bid meeting:
The Site Visit for the captioned project has been planned on 15.05.2025 from 10 AM for which the bidders may cordinate with Mr. Rohit Choubey (Manager, Mobile No.: 7838602604) for the site location. The location of the site is mentioned below:
Venue – Gadhi, Tehsil: Badnawar and Nawapada, Rajod, Tehsil: Sardarpur
Meeting Point GMap Location – https://maps.app.goo.gl/SaekaBUK7tuaqY6FA
Further, the Pre-Bid meeting has been scheduled on 16.05.2025 at 11 AM which will be conducted in hybrid mode at following venue:
Offline Pre Bid Meeting Venue: Hotel Sayaji, H/1, Maguda Nagar, Vijay Nagar, Scheme No 54, Indore, Madhya Pradesh 452010
Online Pre Bid Meeting Link:
The bidder may take a note that Site Visit is mandatory requirement for participation in the tendering process.
Prospective bidders interested to participate in the site visit and pre bid meeting may register the names and email ids of respective participants by mailing to umesh.patidar@seci.co.in and sandeeprana@seci.co.in.
Related posts:
- Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, Madhya Pradesh – EQ
- Site visit and Pre Bid Meeting notification: Tender for Design, Engineering, Procurement & Supply, Construction & Erection, Testing, Commissioning and Comprehensive Operation & Maintenance (O&M) for 10 (ten) years of SCCL’s 10 MW FSPV project at STPP – EQ
- Site Visit and Pre-bid meeting: RfS Setting up of Grid-Connected Floating Solar PV Projects with BESS in Lakshadweep under RESCO Mode – EQ
- NIT for MTPFST of 260 MWp domestically manufactured Solar PV Modules with domestically manufactured Solar Cells at Badnawar, Dhar, Madhya Pradesh – EQ