Result, SECI Karnataka T-X ISTS, Solar 600 MW (Koppal Substation). Ayana – 300 MW @ INR 2.36/kWh Fortum – 300 MW out of 400 MW @ INR 2.37/kWh Tariff has seen a rebound amid BCD, GST, and possibly due to draft RE Policy of Karnataka apart from other influencing factors Congratulation to winners
RESULTS OF E-BIDDING AND E-RA FOR 1500 MW GRID-CONNECTED SOLAR PV POWER PROJECTS UNDER CPSU SCHEME, PHASE-II (TRANCHE-II) /web-data/docs/CPSU%20Ph-II%20Tranche-II%20result%20website%20upload.pdf