This is in reference to the RfS for “Selection of Solar Power Developers for Setting up of 1200 MW ISTS-connected Solar PV Power Projects with 600 MW/3600 MWh Energy Storage Systems (ESS) in India under Tariff-based Competitive Bidding (SECI-ISTS-XXI)” issued by SECI. Pre-bid meeting for the RfS has been scheduled as per following details: Date […]
Petition for the Adoption of the tariff of Solar PV Power Projects (Tranche xviii) connected to the inter-state transmission system For more information please see below link:
Petition for Adoption of tariff for 1200 MW Solar PV Power Projects connected to the inter- State Transmission System of the Ministry of Power, Government of India For more information please see below link:
Petition for the Adoption of tariff for 2000 MW inter-State Transmission System Solar PV Power Projects with Energy Storage System (SECI ISTS XVII) For more information please see below link:
Petition for Adoption of tariff for 1500 MW Solar PV Power Projects connected to the inter-State Transmission System For more information please see below link:
Petition for the Adoption of the tariff of Solar PV Power Projects (Tranche xviii) connected to the inter-state transmission system (ISTS) For more information please see below link:
CERC Adopts Tariff for SECI’s 1.2 GW ISTS-Connected Solar PV Power Projects with Energy Storage Systems (Tranche XV) For more information please see below link:
With reference to the RfS issued for selection of Solar Power Developers for Setting up of 500 MW ISTS-connected Solar PV Power Projects in India under Tariff-Based Competitive Bidding (SECI-ISTS-XIX), the pre-bid meeting has been scheduled on 18.02.2025, at 11:00 AM (IST). The meeting will be conducted through video-conferencing on the Microsoft Teams Platform. Invitations […]