
Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India basis with ‘Green- Shoe Option” – EQ
0
0
Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India basis with ‘Green- Shoe Option”
For more information please see below link:
Related posts:
- Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects with ‘Green-Shoe Option” under by Ministry of Power, Govt. of India – EQ
- Petition for Adoption of tariff for 600 MW inter state Transmission System connected Wind Solar Hybrid Power Projects (SECI ISTS IX) – EQ
- Petition for Adoption of tariff of 1000 MW Wind-Solar Hybrid Power Projects connected to the inter-State Transmission System – EQ
- Petition for Adoption of tariff for Long Term Procurement of 300 MW Power from Grid Connected Wind Solar Hybrid Project for meeting Renewable Purchase Obligation – EQ
tags:
1.2 GW ISTS Adoption of Tariff anywhere in India CERC Green-Shoe Option grid connected hybrid power projects REGULATIONS Wind-solar