
Pre-bid meeting: RfP for Supply of 600 MW/1200 MWh Battery Energy Storage System (DC Package) -EQ
Pre-bid meeting: RfP for Supply of 600 MW/1200 MWh Battery Energy Storage System (DC Package)
This is in reference to the “Request for Proposals for Selection of BESS Supplier for 600 MW/1200 MWh Battery Energy Storage System (BESS) along with 15 years of Comprehensive Service and Maintenance (DC Package)” issued by SECI.
Pre-bid meeting for the RfP has been scheduled as per following details:
Date & Time: 19.08.2025 at 02:30 PM (IST).
Mode of meeting: Hybrid mode (Online-Offline mode)
Interested bidders are requested to fill up the following Google Form:
Google Form: https://forms.gle/9FyswiCCn1GHHjxA6
The online meeting will be conducted through video-conferencing on the Microsoft Teams Platform.
Invitations for the meeting will be sent out on 18.08.2025.
Prospective bidders interested in participating in the meeting are requested to fill out the following Google Form: https://forms.gle/PBmzifkYtP5DjyPw8
If you have any queries, please contact us at abhisekhsri@seci.co.in or swapnil.gandhi@seci.co.in.
Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the NIT documents through the websites www.seci.co.in and https://www.bharat-electronictender.com as no separate notification will be issued.
Tender Search Code (TSC) for the RfP in ISN-ETS: SECI-2025-TN000015
Related posts:
- Pre-bid meeting: RfS for Setting up of 25kW Green Hydrogen-based Pilot Project at SNM Hospital, Leh, UT of Ladakh – EQ Mag Pro
- IMPORTANT: Pre-bid meeting for RfS for 500 MW/1000 MWh Standalone BESS Projects (ESS-1) – EQ Mag Pro
- Pre-bid meeting: RfS for Setting up of 400 MW ISTS-connected Wind Power Projects in India (SECI-Tranche-XVIII) – EQ
- Pre Bid Meeting : Tender for the Manufacturing, Testing, Packing and Forwarding, Supply and Transportation of 260 MWp Domestically Manufactured Solar PV Modules with Domestically Manufactured Solar Cells.- EQ