Summary: — ### 📄 **Gujarat Electricity Regulatory Commission (GERC)** **Daily Order in Petition No. 2515 of 2025** **Date of Order:** 04 August 2025 **Petitioner:** German Green Steel and Power Ltd. **Respondent:** Gujarat Energy Transmission Corporation Ltd. (GETCO) **Bench:** Mehul M. Gandhi and S.R. Pandey — ### 🔍 **Case Overview:** German Green Steel and Power Ltd. […]
Petition of the GERC of grid connectivity and commissioning of 7.8 MW solar plant for captive use due to occurrence of uncontrollable events For more information please see below link:
Petition of the GERC (Conduct of Business) Regulations for commissioning the entire evacuation infrastructure due to occurrence of uncontrollable events For more information please see below link:
Petition of GERC (Conduct of Business) Regulations for commissioning the entire evacuation infrastructure due to occurrence of unforeseen and uncontrollable events For more information please see below link: